ENGINEERING
Optimised for today’s demands, engineered for tomorrow.
Strategy, sites, feasibility: we inform the decisions that commit megawatts and years. Power, cooling, network and security: we engineer them all the way to the rack.
SERVICES
What we shed light on
AI and sovereign AI infrastructure strategy
Assess compute needs and data sovereignty and residency requirements, compare building, leasing or outsourcing, then draw up a roadmap.
Electrical architecture
From the grid connection to the rack: substations, distribution, UPS, backup and redundancy levels, engineered with Watts Unlimited.
Cooling architecture
Air, direct-to-chip liquid or hybrid, in a closed loop: heat is rejected to the air, with zero water consumption.
White space and network
Layout of high-density racks, aisles and cable routes, and a low-latency network for GPU clusters.
Security and compliance
Access control, fire protection, segregation and the requirements of the targeted standards, built in from the first drawings.
Technical due diligence
For investors and lenders: a review of the design, redundancy, energy and risks of a project or an existing asset.
Tenders and procurement
Write the specifications, consult the market, evaluate the bids and support the owner through to the award.
RESILIENCE
When a site is hit, compute carries on.
Drones and missiles now target data centres. Nordik.ai audits and designs resilient AI data centres: protecting the facilities, preserving the data and keeping services running when a site is hit.
- Targets of warThis year, data centres have been struck in Ukraine, in Russia and in the Gulf.
- A few thousand dollarsThe price of a drone, against millions of dollars of disruption.
- Data lost for goodOne operator reported that data stored in a Gulf data centre was permanently destroyed by a strike.
Same attack, two architectures
IllustrationIllustration: the same drone attack strikes, on one side, a megacampus whose buildings all depend on one power and cooling yard, and everything stops; on the other, a network of four independent sites watched by radar: one site is hit, inference switches to the other sites and training resumes on another site from the last checkpoint.
One megacampus
Every building depends on one shared power and cooling yard.
- Compute available
- Services
- online
- Data
- on one site only
A network of independent sites
Each site has its own power, cooling and links.
- Compute available
- Inference
- online
- Training
- running
- Data
- replicated
Continuity of compute
Truly independent sites
Several buildings sometimes share the same dependencies: power, cooling, links. We check how independent each site really is.
Inference fails over
Inference services are prepared to switch to another site.
Training resumes
Large AI training runs call for their own backup and recovery strategy.
Six concrete commitments
Assess the risks before investing
Analysis of the site, the physical threats and the dependencies on power, cooling and telecommunications.
For youBuild the cost of resilience into the investment decision.
Design hardened facilities
Protection of critical buildings and equipment, compartmentalisation and limits on the spread of damage, with specialist engineers.
For youReduce the consequences of a localised incident.
Spread capacity across several sites
A modular, geographically distributed architecture, sized to the services that must keep running.
For youKeep operational capacity when a site becomes unavailable.
Secure power and cooling
Redundant supplies and circuits, suitable autonomy and maintenance that can isolate damaged equipment.
For youKeep essential functions running during a disruption.
Integrate aerial threat monitoring
Detection, alert qualification and response procedures, with specialist partners and the competent authorities.
For youLink physical security to day-to-day operations.
Organise a verifiable recovery
Isolated backups, replication, standby capacity and regular restoration and failover drills.
For youDemonstrate recovery times and acceptable data loss.
FIRST STEP
The resilience diagnostic
Compute capacity whose continuity is designed, funded and tested from the start, with measurable commitments for the scenarios chosen.
It delivers:
- A risk map
- Three costed improvement scenarios
- A prioritised programme of works
Then, as you choose: the design, the integration of partners, then monitoring and continuity drills over time.
For data centre operators, sovereign AI projects and investors, and for the banks, telecoms and public services that depend on them.
METHOD
Our method
Listen
Understand your goals, constraints and timeline.
Measure
Gather the site data: power, water, climate, connectivity.
Model
Compare technical and financial scenarios, with their risks.
Recommend
A reasoned decision and an action plan.
DELIVERABLES
What you receive
- Strategic orientation memo
- Single-line diagrams
- Heat load studies
- White space layouts
- Technical specifications
- Technical due diligence report
- Tender package
IN PLAIN TERMS
Frequently asked questions
When should you bring in Nordik’s engineering team?
As early as possible: before choosing the site and before fixing the power. Decisions taken at this stage (energy, land, business model) commit the project for years. We also step in on a project already under way, for technical due diligence.
Should you build, lease or outsource your compute capacity?
It depends on your compute needs, your sovereignty requirements and your investment horizon. We compare the three routes in a technical and financial model, with their risks, then recommend a roadmap.
How do you cool very dense racks in a hot climate?
With liquid brought right to the processors (direct-to-chip), with air, or with both, always in a closed loop. Heat is released into the air by dry coolers sized for the site’s temperatures, with zero water consumption.
What does technical due diligence bring an investor?
A review of the project or the asset: design, redundancy, energy and risks. It says what holds, what must be corrected and what that implies, before funds are committed.