The site
Read the land.
Power, water, climate, grid connection, regulation: every site is assessed before the first drawing.
MANIFESTO
Leadership forged by extreme conditions, from Canada’s polar cold to Arabia’s scorching deserts, from vast expanses of ice to oceans of sand.
EMIRATES · MIDDLE EAST · AFRICA
Nordik.ai engineers, develops and operates data centres for artificial intelligence, from the Emirates to Africa.
Discuss a projectThe site
Power, water, climate, grid connection, regulation: every site is assessed before the first drawing.
The energy
Natural gas turbines generate electricity on site, backed by storage: power available day and night, with or without the grid.
The building
The Next Gen data centre rises from the sand bay by bay and grows with demand.
The intelligence
Closed-loop liquid cooling with zero water consumption, and 24/7 monitoring: the campus produces compute, day and night.
Illustration
WHAT WE DO
Architecture
The master plan starts from the land: relief, soils, water, sun, winds, landscape and wildlife. Then come power, cooling, network and security, all the way to the rack.
Engineering
Strategy, sites, feasibility: we inform the decisions that commit megawatts and years.
Negotiation
We represent your company at every stage of the project. Our mandate and our remuneration are transparent: recommendations rest on your needs, your budget and your goals.
Operations
We help you run AI campuses as critical infrastructure: availability, efficiency and security, measured continuously.
Innovation
Liquid cooling, prefabricated modules, on-site power, digital twins: we prove what makes compute possible in the heat.
CONFIGURATOR
Change the power, the density and the energy: the building reconfigures before your eyes, from the electrical rooms to the data halls.
Loading the 3D scene…
Loading the 3D scene…
At 80–100 kW per rack, a few rows are enough: most of the building brings power in and takes heat out.
Illustrative example: racks of 80 to 100 kW cooled by direct-to-chip liquid (25 kW with air); 7 m bays each holding up to six rows of 16 racks, a PDU room, a UPS and battery room and a transformer, a bay per generator; one generator per four megawatts plus one on standby, in a building next door; dry coolers on the roof; one building up to 50 MW, two beyond; one battery container per two megawatts, one gas turbine per 25 megawatts plus one on standby. Every project is sized to measure.
THERMAL MAP
From the Gulf coast to the Kenyan highlands, heat, humidity, dust and water change everything. Choose a zone.
Dubai · Abu Dhabi · Doha · Kuwait City · Manama · Muscat
Exceptional sunshine; electricity drawn mostly from natural gas.
A qualitative reading, to be refined site by site.
SOVEREIGNTY AND SUSTAINABILITY
Lean, sovereign and frugal centres, and a dialogue with communities that begins before construction.
WATER
Our campuses cool with a closed refrigerant loop: nothing is drawn, nothing evaporates. Even in the heart of the desert, compute does not cost a single drop of water to the places that host it.
0 litres of water consumed
The campus stands where its users are: data and models remain under the jurisdiction of the country that entrusts them.
Dedicated, secure and controlled capacity for sensitive workloads: sovereign AI, research, public services.
Access, logs, indicators: the client keeps visibility and control of its infrastructure.
Generated on site by natural gas turbines, backed by storage and complemented by solar when the project allows.
Server heat is recovered whenever a use exists nearby.
Backup only: they start only when the supply fails, never for everyday power.
Acoustically insulated equipment, for neighbours and teams alike.
Never an afterthought: early information, independent studies, ongoing communication with authorities and communities.
LIFECYCLE
We step in at the stage you are missing, or we carry them all.
Phase 1
Compute needs, sovereignty, budget, timeline.
Phase 2
Land, gas supply, grid connection, solar, water, permits.
Phase 3
Prefabricated modules and critical power engineered with Watts Unlimited.
Phase 4
Integrated testing, ramp-up, handover.
Phase 5
24/7 monitoring, maintenance, measured efficiency.
CANADIAN ROOTS. GLOBAL REACH.
From Canada to the United Arab Emirates, we bring the same technical standards wherever your projects take us.